Project: TL13844
ECO to Boulevard
Client: SDG&E CSE Group
Contact: Timothy Moore
Scope: Performed 3rd party geotechnical and foundation design review, QA/QC inspection of 68 overhead transmission line-drilled piers and 4 micropile foundations.
Piers were 7-10 foot diameter, up to 84 feet in depth, wet, and dry sockets. Micropile arrays varied from 12 to 18 up to 65 feet in length.
Project: TL6914
Los Coches to Loveland
Client: Hayward Baker, Inc.
Contact: Michael Kennedy
Scope: Performed micropile foundation and structural plate connection analysis and design for 45 foundations along the ~11 timelines through sensitive cultural and environmental habitat. Currently, providing QC through field documentation/support during foundation construction.
Project: Substation Grid
Communication System (SGCS)
Client: SDG&E CSE Group
Contact: Craig Riker
Scope: Provided QA/QC inspection and documentation during the construction of the new drilled pier foundation and associated subgrade conduct installation work at 20 different substations.